EU-Förderung (6.477.596 €): Flexible fossile Kraftwerke für den zukünftigen Energiemarkt durch neue und fortschrittliche Turbinentechnologien Hor01.01.2016 EU-Rahmenprogramm für Forschung und Innovation "Horizont"

Auf einen Blick

Text

Flexible fossile Kraftwerke für den zukünftigen Energiemarkt durch neue und fortschrittliche Turbinentechnologien

The share of renewable energy is growing rapidly driven by the objective to reduce greenhouse gas emissions. The amount of electric power which can be supplied to the grid depends on the time of the day and weather conditions. A conventional fleet of thermal power plants is required to compensate for these fluctuations before large scale energy storage technologies will be mature and economically viable. All power market projections expect this to be the case for the next 50 years at least. For a strong expansion of renewables, this fleet has to operate flexibly at competitive cost. Current power plants cannot fill this role immediately without impeding their efficiency and engine lifetime through increased wear and damage induced by the higher number of (shorter) operating/loading cycles. New technologies need to be introduced to balance demand peaks with renewable output fluctuations at minimal fuel consumption and emissions without negative effects on cycling operation. The FLEXTURBINE partners have developed a medium to long term technology roadmap addressing future and existing power plants. The FLEXTURBINE project presented hereafter is the first step in such technology roadmap and consists of: (1) new solutions for extended operating ranges to predict and control flutter, (2) improved sealing and bearing designs to increase turbine lifetime and efficiency by reducing degradation/damages, and (3) an improved lifecycle management through better control and prediction of critical parts to improve competitive costs by more flexible service intervals and planned downtime, and by reducing unplanned outages. In all areas, individual technologies will be developed from TRL 3 to TRL 4-6. FLEXTURBINE brings together the main European turbine manufacturers, renowned research institutes and universities. It involves plant and transmission system operators to include user feedback and to prepare the take-up of the FLEXTURBINE technologies in power plants world-wide.


Geförderte Unternehmen:

Firmenname Förderungssumme
Ansaldo Energia S.p.A. 581.500 €
ANSALDO ENERGIA SWITZERLAND AG 0,00 €
Ceske Vysoke Uceni Technicke V Praze 181.149 €
Comtes FHT AS 140.528 €
Doosan Skoda Power s.r.o. 562.825 €
EVERLLENCE SE 780.000 €
GENERAL ELECTRIC (SWITZERLAND) GmbH 0,00 €
GENERAL ELECTRIC DEUTSCHLAND HOLDING GmbH 571.000 €
KARLSRUHER INSTITUT FUER TECHNOLOGIE 311.806 €
Linkopings Universitet 499.550 €
Lulea Tekniska Universitet 150.000 €
Nuovo Pignone Srl 0,00 €
Nuovo Pignone Tecnologie Srl 150.000 €
PNO Innovation 350.558 €
Politecnico Di Milano 126.250 €
RUHR-UNIVERSITAET BOCHUM 60.000 €
SIEMENS AG 318.350 €
Siemens Energy Industrial Turbomachinery Ltd. 0,00 €
TECHNISCHE UNIVERSITAET DRESDEN 676.125 €
TECHNISCHE UNIVERSITAET MUENCHEN 247.500 €
TECHNISCHE UNIVERSITAT DARMSTADT 224.959 €
Universita Degli Studi Di Firenze 100.000 €
Universita Di Pisa 50.000 €
University of Belgrade - Faculty of Mechanical Engineering 250.000 €
Zapadoceska Univerzita V Plzni 145.496 €

Quelle: https://cordis.europa.eu/project/id/653941

Diese Bekanntmachung wurde von Englisch nach Deutsch übersetzt. Die Bekanntmachung bezieht sich auf einen vergangenen Zeitpunkt, und spiegelt nicht notwendigerweise den heutigen Stand wider.

Creative Commons Lizenzvertrag Die Visualisierungen zu "Ansaldo Energia S.p.A. - EU-Förderung (6.477.596 €): Flexible fossile Kraftwerke für den zukünftigen Energiemarkt durch neue und fortschrittliche Turbinentechnologien" werden von North Data zur Weiterverwendung unter einer Creative Commons Lizenz zur Verfügung gestellt.