Recherchiere Firmen­bekanntmachungen und finanzielle Kennzahlen

EU-Förderung (9.318.197 €): Echtzeit-Mineral-Röntgenanalyse für effizienten und nachhaltigen Bergbau Hor10.05.2017 EU-Rahmenprogramm für Forschung und Innovation "Horizont"

Auf einen Blick

Text

Echtzeit-Mineral-Röntgenanalyse für effizienten und nachhaltigen Bergbau

The X-MINE project supports better resource characterization and estimation as well as more efficient ore extraction in existing mine operations, making the mining of smaller and complex deposits economically feasible and increasing potential European mineral resources (specifically in the context of critical raw materials) without generating adverse environmental impact. The project will implement large-scale demonstrators of novel sensing technologies improving the efficiency and sustainability of mining operations based on X-Ray Fluorescence (XRF), X-Ray Transmission (XRT) technologies, 3D vision and their integration with mineral sorting equipment and mine planning software systems. The project will deploy these technologies in 4 existing mining operations in Sweden, Greece, Bulgaria and Cyprus. The sites have been chosen to illustrate different sizes (from small-scale to large-scale) and different target minerals (zinc-lead-silver-gold, copper-gold, gold) including the presence of associated critical metals such as indium, gallium, germanium, platinum group metals and rare earth elements. The pilots will be evaluated in the context of scientific, technical, socio-economic, lifecycle, health and safety performances. The sensing technologies developed in the project will improve exploration and extraction efficiency, resulting in less blasting required for mining. The technologies will also enable more efficient and automated mineral-selectivity at extraction stage, improving ore pre-concentration options and resulting in lower use of energy, water, chemicals and men hours (worker exposure) during downstream processing. The consortium includes 6 industrial suppliers, 4 research/academic organizations, 4 mining companies and 1 mining association. The project has a duration of 51 months and a requested EC contribution of €9.3M.


Geförderte Unternehmen:

Firmenname Förderungssumme
ADVAFAB Oy 601.475 €
Advacam s.r.o. 558.250 €
Antmicro SP Zoo 470.750 €
?????? ????? ?? 557.156 €
Bergskraft Bergslagen AB 224.000 €
Comex Polska sp. z o.o. 553.753 €
Hellas Gold SA 691.096 €
Hellenic Copper Mines Ltd. 477.750 €
Institutul Geologic Al Romaniei 251.845 €
???????????? ?? 638.260 €
Orexplore AB 1.271.463 €
???????? ?????????? ???????????? 795.625 €
????? ?????? ???????? ???? 0,00 €
TEKNOLOGIAN TUTKIMUSKESKUS VTT Oy 1.899.900 €
Uppsala Universitet 326.875 €

Quelle: https://cordis.europa.eu/project/id/730270

Diese Bekanntmachung wurde von Englisch nach Deutsch übersetzt. Die Bekanntmachung bezieht sich auf einen vergangenen Zeitpunkt, und spiegelt nicht notwendigerweise den heutigen Stand wider.

Creative Commons Lizenzvertrag Die Visualisierungen zu "ADVAFAB Oy - EU-Förderung (9.318.197 €): Echtzeit-Mineral-Röntgenanalyse für effizienten und nachhaltigen Bergbau" werden von North Data zur Weiterverwendung unter einer Creative Commons Lizenz zur Verfügung gestellt.